Originally Posted by Tod74
Originally Posted by traysvega
It was splayed capped ,filled with crete to the bottom on the water pump holes and the usual machine work,line bored hone,square decked with plugs,etc..
I'd build another. :wink:
How much money did/do you have in that block after all that?
650.00 in machine work and 100 bucks in the caps.